The climbing scaffold-mounted concrete placing boom is installed and fixed on the attached lifting scaffold of buildings. It can climb upward synchronously with the scaffold as construction proceeds.
There is no need for embedded supports on floor slabs or independent supporting frames, which eliminates repeated disassembly, installation and relocation, and does not occupy the construction space of floor slabs. The machine can rotate 360 degrees flexibly for concrete distribution. It is mainly applied to the pouring of shear walls and external walls of high-rise buildings. It rises floor by floor along with main structure construction with convenient layout and high efficiency to shorten the construction period, serving as a common supporting distributing equipment for concrete construction of high-rise main structures.
Actual Product Photos


leave a comment